Saturday 7 January 2012

To-Do List

Several days of working on a to-do list that we'd 'saved' until our holiday...
  • The workshop's been tidied up, and I've installed the replacement bolts on the workshop and garage doors.
  • We've made another batch of marmalade. This time we used two lemons and four oranges, which came to just under 0.75 pints of juice. You're meant to add 0.75pt of water (and 6lb sugar) to the Marmade tin; I reckon you should make at least two-thirds of this juice (half a pint), and potentially all of it. With this extra pectin, the boiling time was only about 12 minutes (not the 15 the tin calls for). I looks like another good batch!
  • Another tree surgeon's been to look at the poplars.
  • Our attempt to purchase the hill-side opposite the house has, sadly, come to naught. No great surprise, but we thought we'd enquire!
  • It's been raining for about 48 hours, so we've had to put out buckets to catch the drips in Jenny and Philip's conservatory (they're away for another week).
  • I've put a ceiling light in the middle of the dining room.
  • I've replaced the light switch in the cellar with a waterproof one, as the wall often gets lots of condensation, which didn't feel safe.
  • Liz has, with heavy heart, taken down the Christmas decorations.
  • We've sorted out the Christmas fabrics (windowsill runners, tablecloths, etc), and finished hemming the tablecloth for the kitchen.
  • Crushed and stored a big bunch of applemint that's been drying, ready for making tea.
  • Found the divider for the floor between kitchen and utility room, and started thinning it down to fit.

No comments:

Post a Comment