Tuesday 28 February 2012

Delivery

The biomass installation started today: the oil boiler is now offline (and partly disconnected); the old hot water cylinder is out; the new accumulator tank (enormous) is roughly in position, and the boiler itself is on a pallet in the garage.

We've had nothing to do with this, admittedly, and have, instead, cleaned the house, and switched the beds around, so that the spare divan in the garage (which has drawers built into it) has replaced the one in the guest room (which doesn't). This has been something we've been planning for ages, and means we have much more storage space for things like second duvets—unfortunately, I think it's immediately filled.

No comments:

Post a Comment