Saturday 6 September 2014

Bathroom

Today we've spent working on our en suite: we're now finished insulating all the walls, taking out the bath to do so and replacing it. I've created new pipes to supply the basin in its new position (opposite corner: strictly, I've re-purposed the bidet's pipes), and we've had installed a new electric shower above the bath. Once the insulation is complete, we'll be able to come back, and install the fitted furniture (yet to be ordered), and the shower-bath, basin and toilet (all ordered, to arrive later this month).

Tomorrow then we'll finish fitting the shower (the electrics and plumbing are ready, it just needs attaching), insulate the walls, and put the floor back together.