On Tuesday, the order of cabinets arrived. Nominally, they're kitchen units, because this, for whatever reason, is the most economic way of obtaining cabinets with hardwood doors, even for bedrooms or bathrooms. Anyway: they've safely arrived, a collection of eighteen or so cabinets, with extra packages of shelves, side-panels, shelf supports, and a massive, 4m piece of worktop, which had to go all the way round the house and in through the patio doors. That was rather hairy, as the weather on Tuesday was atrocious, with high winds and heavy rain at the time of delivery...and peace to either side.
It's since been cluttering up the downstairs, although we're gradually taking cupboards up. The 'broom cupboards' that we're re-purposing as full length wardrobes are slightly tricky to manoeuvre: they're 210cm tall, 40-50cm across/deep, and not light. We're getting there, though, doing a couple in a sitting, then taking a break.
Once upstairs, we've positioned the two cabinets for the new en suite, with the basin and toilet placed 'dry' with them, to get a feel for the room. Actually attaching everything is next.
We've also ordered blinds, one for each bathroom, a big one for the patio doors (which are as draughty as predicted), and two for the kitchen, replacing those on the big window behind the sink, and on the old outside door.
It took the best part of a day, but I've also done the plumbing and wiring works for the shower, ready to install the bathroom suite.