Sunday 23 November 2014

Front Guest Room

This weekend's been a bit of everything, getting the front guest room more-or-less finished. There was some electrics (moving the lobby light; adding a wall light above the head of the bed; and getting a switch wire from inside the stud wall into the ceiling space of the bathroom, ready for the electronic lock).

We wanted to put a little niche into the side of the chimney breast, instead of a bedside table (there's not room in the alcove created by the chimney for the bed as well as a little table), which meant propping the wall, taking out some brickwork, and replacing with a lintel and wooden frame. These things take time...

Once that was done, we put up the wall cupboards, which in turn meant we were able to get the contents of the room a bit more rational. With the space that created, we've been able to put up the plasterboard on that side of the dividing room, and do the electrics in it (the PSU for the locks; the lightswitches, and sockets); as well as the plasterboards in the en suite that were missing. We've also put up the plasterboard missing from the sitting room wall, and the kitchen, which have been long overdue. Slowly getting there!

No comments:

Post a Comment