Sunday, 17 August 2014

Back Sitting Room Wall

After finishing very late last night (early this morning), we only got started today at 10-ish, but wanted to press on to get the room back to normal today. We had a few problems with the radiator, but the electrics and plumbing were much simpler, as predicted, with only two radiator pipes dropping down the wall.

We think we've worked out that the big window was, originally, a door on the left (looking from inside), because the bottom part of the wall has been rebuilt with some cement blocks and newer mortar. Similarly, we think there was a window on the other end of the current window, for the same reason. The new window is much bigger, of course, and has a new concrete lintel inside. It's good fun, uncovering how the house has changed over the past two centuries.


Back wall of the sitting room, stripped back to stone (© Ian 2014)

We managed to get the battens on, the insulation in, and the plasterboard back up, apart from the right hand end. There's less space here, because of the cellar door, so we need an even-thinner insulation solution. Maybe next weekend, when we tackle the kitchen, which needs the same thing, we'll finish up.

No comments:

Post a Comment