Saturday, 23 August 2014

Insulating the Kitchen

We've been putting off insulating the kitchen, focussing instead on the other downstairs rooms, until we've had several consecutive days to work on it. There are a number of reasons why, although it's a smaller area of wall than, say, the sitting room, it was always going to take longer. The kitchen units on the external wall, which include the sinks and the water heater (that is: lots of plumbing and electrics) all needed moving; so did the little units to either side of the cooker; the pantry is fiddly (the shelves are, for various reasons, basically un-removeable), and so it was always going to take several days. If it weren't the kitchen, that wouldn't be so bad, but we really couldn't face doing the work over two weekends, and being without use of the kitchen for nine days.

And that's assuming it all went to plan.

So, instead, we've waited until this weekend, which comes at the start of a week off. We only have four days, as on Wednesday we're travelling down to Ludlow, ahead of Katie's wedding on Thursday. Hopefully, though, four days are enough.

It took a long time to get the units removed (inevitably, they weren't installed with ease of removal in mind), but we got them out of the way, and have stripped the wall back and insulated it. Unlike in the other rooms, we've done the window reveals and boards as we've gone.

Tonight's gone on rather, but we've probably broken the back of it.

No comments:

Post a Comment