Front wall, before work (© Ian 2014)
Back wall, before work (© Ian 2014)
We started with the front wall, which we knew was going to be trickier, stripping off the plaster to reveal the stonework. In doing so, we uncovered some complicated wiring for the room's lights, as well as the outside lamp-post in the front garden. Additionally, the wall under the window was, like that in the dining room, much lower on the internal leaf than the external. This was a bit of a pain, as it meant that the radiator brackets go partly onto stonework, partly onto timber frame. We're also going to need some more cavity slab to fill the space.
Eventually, though we sorted out the wiring, and radiator pipes: the former's now much improved, as there are two double sockets (was a double and a single), provision for an outside RCD socket (much desired, as it will allow Christmas lights in the front garden), the switches for the room lights are now in a more sensible location (inside the doorway into the dining room), and the outside lightswitch is separate.
We got the battens on the wall, the insulation secured, and the plasterboards attached, and all by 0220 on Sunday morning. Oops.
Horizontal battens attached; verticals ready; insulation is next (© Ian 2014)
However, it was done, and this was the much trickier of the walls (having electrics, a more complicated windowsill, and being a little larger), so we'd pushed on to get it finished. As a note: we're deliberately leaving the tops of the windows, and the reveals: we need to get the walls proper, with the radiators, done before we can turn the heating on. We'll then have some finishing up to do, but the heating won't be affected.
The insulated front wall, taken the next morning (© Ian 2014)