Tuesday, 8 September 2015

Maintenance

Having finished window frame painting, I had a bit of other work to get done before the season deteriorates. Last Thursday, I had new seamless aluminium gutters put on the back of the workshop, the back of the porch extension, and the back of the utility room. Combined with the main run of guttering on the back that was done last September (03/09/2014), this means the back of the house is now all matching, non-weathering aluminium gutter, which is rather good. The soffits (of the porch and utility room), and the fascia boards (all three), though, are still wooden, and needed repainting. There are a few bits I shall need to repair more carefully next spring, but for now they are, at least, protected.

No comments:

Post a Comment