Wednesday 30 September 2015

Workshop


Almost all of today I've spent in the preservatory and workshop: I'm almost there, but it's going to take a bit more effort tomorrow evening to finish. We've very nearly got a properly organized workshop, for the first time ever, with all the tools and parts in sensible places, and each with a home.

By about 3, I was properly bored of tidying and sorting, though, so I switched tasks. I've now brought all the CCTV camera cables in to the middle loft (one was above the dining room, and two above the kitchen). I've put up a shelf at the back of the dressing room, on which the router, CCTV controller, ethernet switch and—one day—NAS can sit. I've also put two new double power sockets next to the shelf, to power all that kit. I still need to mount the CCTV cameras, hook everything up, and install the switch—at the moment, I only have the four sockets on the router to connect things to, but once the switch is there, and I've patch-cabled all the sockets on the patchpanel to it, all the LAN sockets in the house should work.

No comments:

Post a Comment